Technology Tracking ...

Juventus won by 2-1, Mario Mandzukic showing outstanding technique

On 29th July, Serie A champions Juventus ushered the second summer warm-up match in Poland, the opponents was Lechia Gdańsk. Juventus defeated the opponent by the score of 2-1 with the goals of Paul Pogba and Mario Mandzukic and got the first warm-up match victory.

Juventus formed the lineup of fifa coins 3-5-2 in the game, the new signing Paulo Dybala cooperated with Simone Zaza on the forward line and Sami Khedira also appeared on the Starting.

Inspiring Article

I am definitely enjoying your website. Excellent and very exciting site. This site  Designs looks very fabulous. Bundles of thanks. Heavy duty gym flooring

The friendly match between Brazil and Argentina are canceled

FIFA corruption scandal continued to fifa coins
ferment, which leads to the cancel of the friendly match between Brazil
and Argentina. The friendly match is planned to be held in September in
the United States.

Oracle Sessions Monitoring

The following will discuss the information that can be gathered regarding a specific session. .

The main location for all session information is the v$session view.
The sessions.sql script displays session information using this view along with the v$process, v$sesstat, and v$statname views.
The v$process view provides information about the background processes that service the sessions,
while the v$sesstat and v$statname provide statistical information about the session.

select a.username, a.osuser, a.sid, a.SERIAL# , d.spid,

Fixmbr - Repair Master Boot Record (to remove Grub or lilo Boot menu)

To Fix Master Boot Record to remove Grub or lilo Boot menu I found this post http://www.ambience.sk/fdisk-master-boot-record-windows-linux-lilo-fixmbr.php is really helpful.

and all what I did is to download MbrFix.exe

and to run the Recommended use of mbrfix to run Windows again

Create any bootable floppy disk/diskette A: (even with older Windows systems)

Sending xmlbean request to Service using SOAP-UI

If you want to send a sample XML bean request to one of your webservice operation using SOAP UI.
You will have to take care of some points while constructing the xmlbean sample request:

  1. Replace < with "&lt ;" without space
  2. start immediately after your operation parameter that is going to enclose the sample request with the request tag.
  3. this request tag should include the xmlns attribute relevant to your XSD.
    ex: xmlns="http://www.xmlbean.project.company.com"

WSIT Webservices keystore/truststore config keeps generated in the wsit-aa.bb.cc.ServiceName.xml

My WEB-INF\classes\META-INF\wsit-com.gemplus.scms.gateway.pis.PISServices.xml

keeps getting the following ws-policy keyStore
<sc:KeyStore wspp:visibility="private" type="JKS" storepass="changeit" alias="xws-security-server"/>

injected into my wsit-com.gemplus.scms.gateway.pis.PISServices.xml and which causes a problem while trying to run my web application and generates the following stack trace

Windows Batch for renaming files extensions

Sometimes you need some batches for doing stuff like appending extension to existing files or removing extension from existing files
After googleing as I'm not good in CMD scripting I manged to write both renameToOld.bat and undo-renameToOld.bat batches
which rename all the files found in a specific folder to *.old and reverse operation by removing the .old extension from the files found in a specific folder.

for renameToOld.bat :
@ECHO OFF

REM
REM Remove the double quotes from the front and end of the root path
REM

Changing the java package view in Netbeans 6.9.1

In this post I will provide answer to a question that is being asked too many times.

the question is How can I change the Java package view in Netbeans 6 to be tree view?

as most of NB users in previous releases used to change this from menus Look and feel; in the current release of Netbeans 6.x.x they have changed the way that can be used to change the java package view to be done by a simpler way that no body will even think about trying it which is.

Mubarak 8 months to Handover

in my field which is IT any one who wanna leave his job have to handover his duties in a period not more than 1 month and not less than 1 month unless agreement between the employer and the employee stated that the employee can hand over in less period.

This agreement stands in the employer side so that the work can go on after the employee leaves.

 If we applied this on the Egyptian situation I guess President Mubarak (Employee) doesn't need 8 months to handover especially the employer (Egyptians) don't need this handover.

Powered by Drupal - Design by artinet